Sign In
Apply for Membership
About
Events
Archive
Contact
Map
Pictures
Forums
For Sale
Thanks guys. I'm still tentatively working my way through the jobs list... As Doris is a 9M the heads is aft so I'm putting the pump out black water tank under the starboard main sole. The grey water flexible tank will go under the shower that was the port quarter berth. I've decided to keep the two systems separate and discharge the grey over the side using a diverter valve off the manual bilge pump. Plumbing this way negates the need to link the two tanks and so avoids trying to run pipework across the bridge deck. Those should make things a little simpler. I hope that makes sense, I fear the whisky is making it all seem so easy!
Cancel
Howdy, Stranger!
It looks like you're new here. If you want to get involved, click one of these buttons!
Sign In
Register